Product Details:
Payment & Shipping Terms:
|
Condition: | 100% New | Application: | Buildings And Projects |
---|---|---|---|
Type: | Fixed With Tower Head | Max. Load: | 12t |
Jib Length: | 64m | Tip. Load: | 2.5t |
Mast section: | 2*2*3m (Potain Type) | Electric Box: | Schneider |
Power Supply: | 380V/50Hz, 415V/50Hz, 220V/50Hz Or According To Clients Need | Control Type: | Invter Or VFD |
12t Building Top Less Tower Crane PT6425 Inverter Control Construction Crane
Performance parameters of PT6425: performance parameters and technical indexes reach both domestic and international advanced level.
• Max. jib length: 64m;
• Max. lifting capacity 12t;
• Max. hoisting capacity at jib tip:2.5t;
• Rated lifting moment: 2300 Kn.m;
• Max. freestanding height: 50m; Max. working height of anchored crane: 180m;
Specification
Rated Lifting Moment (KN.M) | 2300 |
Rated Loading Capacity (t) | 12 |
Max. Lifting Load (t) | 12 |
Span (m) | 64 |
Working range (m) | 3 to 64 |
Tip Load (t) | 2.5 |
Max. Lifting Height (m) | 180 |
Free standing height (m) | 50-60 |
Rope length (m) | 500 |
Slewing speed (r/min) | 0-0.6 |
Trolley peed (m/min) | 0-60 |
Jacking-up speed (m/min) | 0.4 |
Power supply | 380V/50Hz or according to client's requirements |
Power Capacity (kw) | 61.5 |
Electric switch box | Schneider |
Main Material (mm) | 200*20 / angle steel |
Mast section (m) | 2*2*3 (split type) |
The eight advantages about the flat-top crane
1.reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.
2. it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.
3. It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.
4. It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.
5. It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.
6.The steel structure of crane boom has long using life and high safety standard.
7. The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.
8. Low design cost, short cycle, can much better satisfy the multiple demands of the customers.
Pictures